• Remote Energy

  • Power Generation

  • Manufacture to Requirements  

  • Industrial Energy Demands

Position to Exceed the United States Advanced Battery Consortium Goal of 1992

ENERGY STORAGE MODULE (ESM)

Target hardware cost as at <10% of LiPB pouch cells @=< $500kWhr

GET IN

TOUCH

Schedule a Meeting, Limited Availability

1414 Combermere Dr.
Troy, MI.  48083
United States

© 2019 Prime Energy C.S.